kıbrıs ingiltere londra lefkoşa
DOLAR
35,2192
EURO
36,8193
STERLIN
44,4203
BITCOIN
$94.836
Adana Adıyaman Afyon Ağrı Aksaray Amasya Ankara Antalya Ardahan Artvin Aydın Balıkesir Bartın Batman Bayburt Bilecik Bingöl Bitlis Bolu Burdur Bursa Çanakkale Çankırı Çorum Denizli Diyarbakır Düzce Edirne Elazığ Erzincan Erzurum Eskişehir Gaziantep Giresun Gümüşhane Hakkari Hatay Iğdır Isparta İstanbul İzmir K.Maraş Karabük Karaman Kars Kastamonu Kayseri Kırıkkale Kırklareli Kırşehir Kilis Kocaeli Konya Kütahya Malatya Manisa Mardin Mersin Muğla Muş Nevşehir Niğde Ordu Osmaniye Rize Sakarya Samsun Siirt Sinop Sivas Şanlıurfa Şırnak Tekirdağ Tokat Trabzon Tunceli Uşak Van Yalova Yozgat Zonguldak
LONDRA
Hafif yağmur
10°C
LONDRA
10°C
Hafif yağmur
Salı Hafif yağmur
11°C
Çarşamba Açık
="http://www.w3.org/2000/svg" viewBox="0 0 300 300" enable-background="new 0 0 300 300">
9°C
Perşembe Kapalı
="http://www.w3.org/2000/svg" viewBox="0 0 300 300" enable-background="new 0 0 300 300">
8°C
Cuma kapalı
="http://www.w3.org/2000/svg" viewBox="0 0 300 300" enable-background="new 0 0 300 300">
8°C

Council deputy resigns after Marble Arch Mound costs hit £6m

Council deputy resigns after Marble Arch Mound costs hit £6m
13.08.2021
0
A+
A-

The deputy leader of Westminster City Council has resigned after the total costs for the beleagured Marble Arch Mound nearly doubled to £6 million.

The mound opened as a free attraction on August 9 after opening to a flood of criticism on July 26 following what the council called “teething problems”.

The council’s leader, Rachael Robathan, said in a statement on Friday her deputy Melvyn Caplan had resigned with immediate effect after a “totally unacceptable” rise in costs.

“The Mound opened too early, and we have apologised for that,” Ms Robathan said.

“It has become clear that costs have risen more than anticipated and that is totally unacceptable. Our original forecast cost was £3.3 million. Total costs are now £6m, covering every aspect of the project: construction, operation and eventual removal.

“With regret, I have accepted the resignation of my deputy leader, Melvyn Caplan, who led the Mound project. We have also instigated a thorough internal review to understand what went wrong and ensure it never happens again”

The 25-metre mound, planned by Dutch architect company MVRDV, was designed to give views of Oxford Street Hyde Park, Mayfair and Marylebone.

It is part of a scheme to increase footfall in the shopping district as lockdown restrictions ease.

“We are determined to continue our hard work to restore our city’s vibrancy, bring back visitors and ensure people can keep their jobs,” Ms Robathan said on Friday.

“Doing nothing was never an option. So when the Mound fully reopens in September, I hope that people will come and see it for themselves. The Mound may delight or divide views and that’s ok, but we’re confident that in the end it will fulfil its original brief – to get people back into the West End and remind them of why this is a world class City.”

Mr Caplan has served as councillor for Little Venice Ward since 1990, with the Conservative also a former leader of the council.

Yorumlar

Henüz yorum yapılmamış. İlk yorumu yukarıdaki form aracılığıyla siz yapabilirsiniz.