kıbrıs ingiltere londra lefkoşa
DOLAR
32,5658
EURO
34,9692
STERLIN
40,6086
BITCOIN
$64.316
Adana Adıyaman Afyon Ağrı Aksaray Amasya Ankara Antalya Ardahan Artvin Aydın Balıkesir Bartın Batman Bayburt Bilecik Bingöl Bitlis Bolu Burdur Bursa Çanakkale Çankırı Çorum Denizli Diyarbakır Düzce Edirne Elazığ Erzincan Erzurum Eskişehir Gaziantep Giresun Gümüşhane Hakkari Hatay Iğdır Isparta İstanbul İzmir K.Maraş Karabük Karaman Kars Kastamonu Kayseri Kırıkkale Kırklareli Kırşehir Kilis Kocaeli Konya Kütahya Malatya Manisa Mardin Mersin Muğla Muş Nevşehir Niğde Ordu Osmaniye Rize Sakarya Samsun Siirt Sinop Sivas Şanlıurfa Şırnak Tekirdağ Tokat Trabzon Tunceli Uşak Van Yalova Yozgat Zonguldak
LONDRA
Orta şiddetli yağmur
11°C
LONDRA
11°C
Orta şiddetli yağmur
Cuma Kapalı
13°C
Cumartesi Orta şiddetli yağmur
="http://www.w3.org/2000/svg" viewBox="0 0 300 300" enable-background="new 0 0 300 300">
13°C
Pazar Hafif yağmur
="http://www.w3.org/2000/svg" viewBox="0 0 300 300" enable-background="new 0 0 300 300">
15°C
Pazartesi kapalı
="http://www.w3.org/2000/svg" viewBox="0 0 300 300" enable-background="new 0 0 300 300">
12°C

Turkey’s Aksa Energy establishes company in Africa to generate electricity for Madagascar

Turkey’s Aksa Energy said it has founded a company in Mauritius with a local partner to establish a 120-megawatt (MW) power plant in Madagascar, in a written statement on Aug. 8.

Turkey’s Aksa Energy establishes company in Africa to generate electricity for Madagascar
08.08.2016
0
A+
A-

 

 

n_102586_1

Turkey’s Aksa Energy said it has founded a company in Mauritius with a local partner to establish a 120-megawatt (MW) power plant in Madagascar, in a written statement on Aug. 8. “Our company founded a Mauritius-based company, dubbed Aksaf Power Ltd., some 58.35 percent which is owned by Aksa Energy and the remaining 41.65 by a local partner, to establish a 120-MW heavy fuel oil [HFO] power plant in the Republic of Madagascar and to sell the generated power in a 20-year span in a secured manner,” said Aksa Energy to the Public Disclosure Platform (KAP).
The new company will commence the project after the required advances and deposits are taken in line with a deal with Jirama, which is responsible for offering electricity and water services in Madagascar, according to the statement.
“It is planned to start construction by the end of 2016 and begin to generate and sell power by the end of 2017,” noted the company, adding that the power plant was forecasted to make 700,000 MW/h of secured sales on an annual basis and on the U.S. dollar value.
Jirama will provide all field works, fuel supply and license transactions, it noted.
“In the construction of the power plant, the existing HFO power plant equipment in the portfolio of Aksa Energy will be used, minimizing the investment value,” said the company.
“Our power plant, which will generate power in high capacity and on the U.S. dollar basis, will enable us to hedge our foreign exchange denominated debts through a natural mechanism and raise our profitability and sales volume,” added the company.
This will be the company’s second power plant project in Africa after an ongoing project in Ghana, according to the statement. (Hurriyet Daily News)

Yorumlar

Henüz yorum yapılmamış. İlk yorumu yukarıdaki form aracılığıyla siz yapabilirsiniz.